Dedication to craftsmanship

A lot has changed in the past 3 years since we made the first item for Stitch Spring, but some things are still staying the same. We are dedicated to making the best quality items we possibly can while operating sustainably. Each item takes countless hours to produce because patterns are not just printed but stitched into the fabric to ensure the item is not just a piece you wear once and can throw away afterwards, but last you many years! No item goes to waste because we only produce what is needed to minimize the environmental impact. Each item is specially made and packed for you and we are glad to see so many of you enjoying your items when you get your package in the mail.

Preorder Timeline

WAVE 25 PREORDERS (Starting 12.01.2024 at 2:30pm EST)

December 1st: You can place preorders for the designs that remained in the store.

December 15th: More designs may get vaulted before the next wave starts the same day at 2:30 PM EST.

Mid December - End of December: Preparing for the production & finalizing details.

Mid January - Mid March: Production begins, estimated to take around 25-35 days excluding public holidays.

End of March - End of April: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

End of April - Mid May: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

 

WAVE 24 PREORDERS (Starting 11.17.2024 at 2:30pm EST)

November 17th: You can place preorders for the designs that remained in the store.

December 1st: More designs may get vaulted before the next wave starts the same day at 2:30 PM EST.

Beginning of December - Mid December: Preparing for the production & finalizing details.

End of December - End of February: Production begins, estimated to take around 25-35 days excluding public holidays.

Beginning of March - Beginning of April: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

Beginning of April - End of April: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

 

WAVE 23 PREORDERS (Starting 11.03.2024 at 2:30pm EST)

November 3rd: You can place preorders for the designs that remained in the store.

November 17th: More designs may get vaulted before the next wave starts the same day at 2:30 PM EST.

End of November - Mid December: Preparing for the production & finalizing details

End of December - End of February: Production begins, estimated to take around 25-35 days excluding public holidays.

Beginning of March - Beginning of April: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

Beginning of April - End of April: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

 

WAVE 22 PREORDERS (Starting 10.20.2024 at 2:30pm EST)

October 20th: You can place preorders for the designs that remained in the store.

November 3rd: More designs may get vaulted before the next wave starts the same day at 2:30 PM EST.

Mid November - Beginning of December: Preparing for the production & finalizing details

Mid December - Mid February: Production begins, estimated to take around 25-35 days excluding public holidays.

End of February - End of March: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

End of March - Mid April: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

 

WAVE 21 PREORDERS (Starting 10.06.2024 at 2:30pm EST)

October 6th: You can place preorders for the designs that remained in the store.

October 20th: More designs may get vaulted before the next wave starts the same day at 2:30 PM EST.

Beginning of November - End of November: Preparing for the production & finalizing details

Beginning of December - Beginning of February: Production begins, estimated to take around 25-35 days excluding public holidays.

Mid February - Mid March: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

End of March - Beginning of April: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

 

WAVE 20 PREORDERS (Starting 09.22.2024 at 2:30pm EST)

September 22nd: You can place preorders for the designs that remained in the store.

October 6th: More designs may get vaulted before the next wave starts the same day at 2:30 PM EST.

Mid October - Beginning of November: Preparing for the production & finalizing details

Mid November - End of January: Production begins, estimated to take around 25-35 days excluding public holidays.

Beginning of February - Beginning of March: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

Mid March - End of March: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

 

WAVE 19 PREORDERS (Starting 09.08.2024 at 2:30pm EST)

September 8th: You can place preorders for the designs that remained in the store.

September 22nd: More designs may get vaulted before the next wave starts the same day at 2:30 PM EST.

Beginning of October - Mid October: Preparing for the production & finalizing details

End of October - Mid January: Production begins, estimated to take around 25-35 days excluding public holidays.

End of January - End of February: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

Beginning of March - Mid March: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

 

WAVE 18 PREORDERS (Starting 08.25.2024 at 2:30pm EST)

August 25th: You can place preorders for the designs that remained in the store.

September 8th: More designs may get vaulted before the next wave starts the same day at 2:30 PM EST.

End of September - Beginning of October: Preparing for the production & finalizing details

Mid October - Beginning of January: Production begins, estimated to take around 25-35 days excluding public holidays.

Beginning of January - Beginning of February: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

Mid February - Beginning of March: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

 Current Status: Production Phase is going as planned.

 

WAVE 17 PREORDERS (Starting 08.11.2024 at 2:30pm EST)

August 11th: You can place preorders for the designs that remained in the store.

August 25th: More designs may get vaulted before the next wave starts the same day at 2:30 PM EST.

Mid September - End of September: Preparing for the production & finalizing details

Mid November - End of December: Production begins, estimated to take around 25-35 days excluding public holidays.

End of December - End of January : Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

Beginning of February - End of February: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

Current Status: Production Phase is going as planned.

 

WAVE 16 PREORDERS (Starting 07.28.2024 at 2:30pm EST)

July 28th: You can place preorders for the 3 new designs. 

August 11th: More designs may get vaulted before the next wave starts the same day at 2:30 PM EST.

End of August - Mid September: Preparing for the production & finalizing details

End of September - Mid November: Production begins, estimated to take around 25-35 days excluding public holidays.

Beginning of December - Beginning of January : Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

Mid January - Beginning of February: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

 Current Status: Production Phase is going as planned.

 

WAVE 15 PREORDERS (Starting 07.14.2024 at 2:30pm EST)

July 14th: You can place preorders for the 3 new designs. 

July 28th: More designs may get vaulted before the next wave starts the same day at 2:30 PM EST.

Beginning of August - End of August: Preparing for the production & finalizing details

Beginning of September - End of October: Production begins, estimated to take around 25-35 days excluding public holidays.

Mid November - End of December : Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

End of December - Mid January: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

Current Status: Production Phase is going as planned.

 

WAVE 14 PREORDERS (Starting 06.30.2024 at 2:30pm EST)

June 30th You can place preorders for the 3 new designs. 

July 14th: More designs may get vaulted before the next wave starts the same day at 2:30 PM EST.

Mid July to End of July: In stock Slayer Tees (if not combined with any preorder item) will be sent out by air. Delivery times will depend on where you are located. Expect to receive your Tee between End of July and Mid August. Slayer Tee orders that include preorder items as well, will be shipped according to the rest of this timeline

Beginning of August: Preparing for the production & finalizing details

End of August - Mid October: Production begins, estimated to take around 25-35 days excluding public holidays.

Beginning of November - Mid December : Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

Mid December - End of December: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

Current Status: Shipments started ahead of schedule.

 

WAVE 13 PREORDERS (Starting 06.16.2024 at 3pm EST)

June 16th You can place preorders for the 3 new designs. 

June 30th: More designs may get vaulted before the next wave starts the same day at 2:30 PM EST.

Mid July: Preparing for the production & finalizing details

Beginning of August - End of September: Production begins, estimated to take around 25-35 days excluding public holidays.

Mid October - End of November : Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

Mid November - Beginning of December: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

Current Status: Shipments started ahead of schedule.

 

WAVE 12 PREORDERS (Starting 06.02.2024 at 3pm EST)

June 2nd: You can place preorders for the 3 new designs. 

June 16th: More designs may get vaulted before the next wave starts the same day at 3PM EST.

End of June: Preparing for the production & finalizing details

Mid July - Beginning of September: Production begins, estimated to take around 25-35 days excluding public holidays.

Mid September - Beginning of End of October: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

Beginning of November - Mid November: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

Current Status: Shipments started ahead of schedule.

 

WAVE 11 PREORDERS (Starting 05.19.2024 at 3pm EST)

May 19th: You can place preorders for the 3 new designs. 

June 2nd: More designs may get vaulted before the next wave starts the same day at 9 am EST.

Mid June: Preparing for the production & finalizing details

End of June - Mid August: Production begins, estimated to take around 25-35 days excluding public holidays.

End of August - Beginning of October: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

Mid October - End of October: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

Current Status: Shipments started ahead of schedule.

 

WAVE 10 PREORDERS (Starting 05.05.2024 at 3pm EST)

May 5th: You can place preorders for the 3 new designs. 

May 19th: More designs may get vaulted before the next wave starts the same day at 9 am EST.

End of May: Preparing for the production & finalizing details

Beginning of June - End of July: Production begins, estimated to take around 25-35 days excluding public holidays.

Beginning of August - Mid September: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

End of September - Beginning of October: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

Current Status: Shipments started ahead of schedule. Refer to your emails to estimate when your order will arrive in your country and keep and eye on your tracking information. Sea shipments currently take between 25 to 35 days. Air shipments are quicker.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

 

WAVE 9 PREORDERS (Starting 04.21.2024 at 3pm EST)

April 21st: You can place preorders for the 3 new designs. 

May 5th: More designs may get vaulted before the next wave starts the same day at 9 am EST.

Mid May: Preparing for the production & finalizing details

End of May - Beginning of July: Production begins, estimated to take around 25-35 days excluding public holidays.

Mid July - End of August: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

Beginning of September - Mid September: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

Current Status: Shipping Phase is going as planned.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

 

WAVE 8 PREORDERS (Starting 04.07.2024 at 9 am EST)

April 7th: You can place preorders for the 3 new designs. 

April 21st: More designs may get vaulted before the next wave starts the same day at 9 am EST.

End of April: Preparing for the production & finalizing details

Beginning of May - Mid June: Production begins, estimated to take around 25-35 days excluding public holidays.

End of June - Beginning of August: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

Mid August - End of August: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

Current Status: Shipping Phase is going as planned.

 

WAVE 7 PREORDERS (Starting 03.24.2024 at 9 am EST)

March 24th: You can place preorders for the 4 new designs. 

April 7th: More designs may get vaulted before the next wave starts the same day at 9 am EST.

Mid April: Preparing for the production & finalizing details

End of April - End of May: Production begins, estimated to take around 25-35 days excluding public holidays.

Beginning of June - Mid July: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

End of July - Beginning of August: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

Current Status: Shipping Phase is going as planned.

 

WAVE 6 PREORDERS (Starting 03.10.2024 at 9 am EST)

March 10th: You can place preorders for the 4 new designs. 

March 24th: More designs may get vaulted before the next wave starts the same day at 9 am EST.

End of March: Preparing for the production & finalizing details

Beginning of April - Mid May: Production begins, estimated to take around 25-35 days excluding public holidays.

Mid May - Mid June: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

End of June - Mid July: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

Current Status: Delivered!

 

WAVE 5 PREORDERS (02.25.2024 - 03.10.2024)

February 25th: You can place preorders for the 4 new designs. 

March 10th: More designs may get vaulted before the next wave starts the same day at 9 am EST.

Mid March: Preparing for the production & finalizing details

End of March - Beginning of May: Production begins, estimated to take around 25-35 days excluding public holidays.

Beginning of May - Beginning of June: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

Mid June - Beginning of July: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

Current Status: Delivered!

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

 

WAVE 4 PREORDERS (Starting 02.18.2024 at 9 am EST)

February 18th: You can place preorders for the 4 new designs. 

February 25th: More designs may get vaulted before the next wave starts.

Beginning of March: Preparing for the production & finalizing details

Mid March - End of April: Production begins, estimated to take around 25-35 days excluding public holidays.

End of April - End of May: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

Mid June - End of June: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

Current Status: Delivered!

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

 

WAVE 4 PREORDERS (Starting 02.11.2024 at 9 am EST)

February 11th: You can place preorders for the 4 new designs. 

February 25th: More designs may get vaulted before the next wave starts.

Beginning of March: Preparing for the production & finalizing details

Mid March - End of April: Production begins, estimated to take around 25-35 days excluding public holidays.

End of April - End of May: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

Mid June - End of June: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

Current Status: Delivered!

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

 

WAVE 3 PREORDERS (01.28.2024 - 02.11.2024)

January 28th: You can place preorders for the 3 new designs. 

February 11th: More designs may get vaulted before the next wave starts.

End of February: Preparing for the production & finalizing details

Beginning of March - Mid April: Production begins, estimated to take around 25-35 days excluding public holidays.

Mid April - Mid May: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

End of May - Mid June: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

Current Status: Delivered!

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

 

WAVE 2 PREORDERS (01.15.2024 - 01.28.2024)

January 15th: You can place preorders for the 3 remaining designs. 

January 28th: More designs may get vaulted before the next wave starts.

Beginning of February: Preparing for the production & finalizing details

Mid February - Mid March: Production begins, estimated to take around 25-30 days excluding public holidays. At the end of January there will be a public holiday and production will pause for 10 days and resume in february. We will aim to send out your items shortly after the holiday.

Mid April - Beginning of May: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

Mid - End of May: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

Current Status: Delivered!

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured. You will also be able to see the most important updates / current status here****

 

WAVE 1 PREORDERS (12.31.2023 - 01.14.2024)

December 31st - January 14th: The Website opens & you can place a preorder until 3 of the new designs get vaulted January 14th at midnight

Mid January: Preparing for the production & finalizing details

February - March: Production begins, estimated to take around 25-30 days excluding public holidays. At the end of January there will be a public holiday and production will pause for 10 days and resume in february. We will aim to send out your items shortly after the holiday.

March: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

April -Beginning of May: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier in the destination country is handling your package.

Current Status: Delivered!

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured****

 

TITAN FINAL CHAPTER DROP (Preorders December)

December 17th: The Website opens & you can place a preorder until December 27th (It may close earlier if the preorder limit gets reached).

End of December: Preparing for the production & finalizing details

January - February: Production begins, estimated to take around 25-30 days excluding public holidays. At the end of January there will be a public holiday and production will pause for 10 days and resume in february. We will aim to send out your items before.

February - March: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days and will be a bit faster for air shipping countries.

March - Beginning of April: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier is handling your package.

Current Status: Delivered!

****Note this is a time estimate: We added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through broadcast channel updates and post frequently on my socials so please rest assured****

 

IDOL DROP (Preorders October)

October 1st - 22nd: Website opens & you can place a preorder (It may close earlier due to too many orders).

End of October: Preparing for the production & finalizing details

November - December: Production begins, estimated to take around 25-30 days excluding public holidays.

Beginning of December: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days.

Beginning of January - Beginning of February: Items reach their destination countries and will be delivered to you with the final carriers. The items arrive within 2 to 14 days after the tracking indicates that the final carrier is handling your package.

Current Status: Delivered!

****Note this is a time estimate: I added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through website updates and post frequently on my socials so please rest assured****

D S DROP (Overstock & Preorders August)

This is applicable to you if you preordered a demon slayer item from the current drop. Overstock items will be sent out a lot faster.

August 26th - September 9th: Website opens & you can place a preorder (It may close earlier due to too many orders).

Mid September: Preparing for the production & finalizing details

End of September - End of October: Production begins, estimated to take around 20-25 days excluding public holidays.

November: Items shipped from our manufacturing locations to us & our logistics partners. You might already get tracking information, but it will not update until the items are in the destination country. This can take 20 to 45 days.

End of November - Beginning of December: Items reach our side and we send the items out with the final carriers. The items arrive within 2 to 14 days after they have been sent out from this stage.

Current Status: 
USA, Australia, Canada, UK, Switzerland & Asia: Delivered!
EU: Arrived in the EU. Delayed in logistics company's warehouse due to influx of shipments during Christmas

****Note this is a time estimate: I added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through website updates and post frequently on my socials so please rest assured****

D S DROP (First Round)

This is applicable to you if you preordered a demon slayer item from the current drop. In-stock items will be sent out a lot faster.

June 4th - June 17th: Website opens & you can place a preorder (It may close earlier due to too many orders).

End of June: Sending the order requests and finalizing details.

July: Production begins, estimated to take around 20-25 days excluding public holidays.

August: Items shipped from manufacturer's side to me / Items produced in house will be sent out.

August - Beginning of September: Items reach my side and I begin with fulfilling, quality control, finalizing touches, shipping out all the preorders.

Current Status: Delivered!

****Note this is a time estimate: I added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through website updates and post frequently on my socials so please rest assured****

 

TITAN DROP

March 19th: Website opens & you can place a preorder (It may close earlier due to too many orders).

End of March: Sending the order requests and finalizing details.

April: Production begins, estimated to take around 20-25 days excluding public holidays.

May: Items shipped from manufacturer's side to me / Items produced in house will be sent out.

May - Beginning of June: Items reach my side and I begin with fulfilling, quality control, finalizing touches, shipping out all the preorders.

Current Status: Delivered!

****Note this is a time estimate: I added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through website updates and post frequently on my socials so please rest assured****

 

CSM DROP

This is applicable to you if you preorder a chainsaw man item from the current drop. In-stock items will be sent out a lot faster.

Feb 3rd - 15th: Website opens & you can place a preorder (It may close earlier due to too many orders).

Mid Feb: Sending the order requests and finalizing details.

Mid Feb - End March: Production begins, estimated to take around 20-25 days excluding public holidays.

March - April: Items shipped from manufacturer's side to me.

April - May: Items reach my side and I begin with fulfilling, quality control, finalizing touches, shipping out all the orders.

Current Status: Delivered!

****Note this is a time estimate: I added time buffers to the time needed to produce and send out the items, however there still may be delays that happen beyond my limitations. I will keep communications with you through website updates and post frequently on my socials so please rest assured****